Point of contraflexure
![]() |
The point of contraflexure (PoC) occurs where bending is zero and at the point of change between positive and negative (or between compression and tension). |
In a beam that is flexing (or bending), the point where there is zero bending moment is called the point of contraflexure. At that point, the direction of bending changes its sign from positive to negative or from negative to positive. (It may also be thought of as a change from compression to tension or vice versa).
For this change to happen, it must pass through zero – the point of contraflexure. On a bending moment diagram, it is the point at which the bending moment curve intersects with the zero line.
An analogy may be made with a speeding train travelling west on a single track. In order to reverse direction and travel east, it must decelerate, stop then accelerate in the opposite direction. The point it stops, even if momentary, is zero – the neutral point, where it is not travelling.
Theoretically, when considering a structural member under load, such as a reinforced concrete beam, the point of zero bending moment would seem to suggest no reinforcement would be required. However, omitting reinforcement at that point is considered inadvisable as, in a real-life situation, it may be difficult to locate the exact point of contraflexure.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.